Bourn House
Coventry, UK

Description
Duration: 44 Weeks
KEY DISCIPLINES:
Air Conditioning – 285 Mitsubishi Fan Coil Units
Ventilation – 2 Dalair AHUs
Domestic Services
Public Health
BMS

Project Particulars
The scope included BREEAM measures such as water shut off systems and leak detection. The design principles of replacing the AHU systems greatly enhanced the efficiency of air movement, increasing the contribution to the building’s inherent sustainability performance. Additionally, we assisted in lifting the building EPC required by the Client from a ‘B’ to an ‘A’ rating.