University House

(15 Bartholomew Row, Birmingham B5 5JU)

Description

Cat-B fit-out completed across five floors and a plant deck. Heating and cooling are delivered via a newly installed Daikin VRF system, operating in conjunction with two new roof-mounted AHUs. These units incorporate heat recovery systems to enhance the building’s energy efficiency. Additionally, TES installed new Vulcathene drainage and boosted cold water services to support the laboratory and workshop areas.

Sector: Education
Duration: 30 Weeks

Key Disciplines:

Air Conditioning – 50 Daikin Cassette Units

Ventilation – 2 Flakt Roof Mounted AHUs

Domestic Services – Refurbishment of 5 Levels of toilet blocks as well as Domestic water services to the Lab & Workshop Areas

Public Health – Refurbishment of Toilet Blocks and installation of Vulcathene waste to the Lab & Workshop Areas

Rainwater – New rainwater drainage system installed

Project Particulars

This project utilised early contractor engagement which enabled TES Mech to develop the design from RIBA Stage 2 to Stage 5 whilst providing Value Engineering advise on the Mechanical Systems to reduce the overall cost of the project.