Bourn House

Coventry, UK 

Description

Cat A fit out of four floors of newly refurbished office space. Works included a large VRF heating and cooling system, working alongside replacement large roof-mounted AHU ventilation distribution systems that fed supply and took away extract air from the floor plates via large-scale ductwork. CPW was the Client-side M&E retained consultant.
Sector: Commercial Office Fit Out
Duration: 44 Weeks

KEY DISCIPLINES:

Air Conditioning – 285 Mitsubishi Fan Coil Units

Ventilation – 2 Dalair AHUs

Domestic Services

Public Health

BMS

Project Particulars

The scope included BREEAM measures such as water shut off systems and leak detection. The design principles of replacing the AHU systems greatly enhanced the efficiency of air movement, increasing the contribution to the building’s inherent sustainability performance. Additionally, we assisted in lifting the building EPC required by the Client from a ‘B’ to an ‘A’ rating.

Get in Touch


TES designs, installs/delivers and maintains systems which breathe life and comfort into a building.

Midlands Office

TES Mech
The Hayes
Lye
Stourbridge
West Midlands
DY9 8NX 

East Regions Office

Gibson House
Ermine Business Park
Spitfire Cl
Huntingdon
PE29 6XU

Contact

+44 (0) 1384 424 722
service@tes-mech.co.uk

TES MECH©Copyright 2025. All Rights Reserved. Site by eleven10.