BT, 3 Snow Hill
Birmingham, UK

Description
Our works included the Cat A and Cat B mechanical installation of 283,000 sq. ft. over thirteen floors within the newly constructed BCO award-winning building, delivering a high-performance mechanical services package designed to enhance comfort, flexibility, and reliability. The works included comfort cooling and heating, ventilation, domestic water and drainage, BMS integration, Sprinkler and specialist comms room support systems.
Sector: Commercial
Duration: 52 Weeks
Quick Facts
Heating & Air Conditioning – Ability 4 Pipe FCUs
Specialist Comms Rooms – Close Control Chilled Water Systems
Ventilation – New and Modified Supply & Extract Ventilation
Public Health – Domestic Hot & Cold Water, Above Ground Drainage for the Office Areas and Commercial Kitchens
Controls – New BMS Integration and Modifications
Sprinklers – New and Modified Sprinklers to all areas

Project Particulars
Services provided: Design, install, testing & commissioning of mechanical services .
3 Snow Hill is a prestigious address in the heart of Birmingham’s central business district.
Heating, ventilation, cooling and plumbing systems were installed across 17 floors of this large office, award-winning (BCO Best Commercial Workplace 2022), landmark building.
This entailed large capital plant being lifted by helicopter on to the 18th floor – the first helicopter lift in Birmingham’s history.
Full-height glazing throughout the building means occupants enjoy stunning vistas over the Birmingham skyline, flooded with natural light but also mean that solar gain has to be carefully considered in the design of the heating and cooling systems.